After a week long trip on work, I came home surprised at the progress and seeing that all the drywall had gone up, the kneewall between the toilet and the shower had gone in, and that taping and mudding was
under way.
This is the formation of our new walk in closet. All of the drywall complete, and canned light placed.
One of our favorite features of the bathroom was the addition of the pocket door to separate the bathroom from the closet. He also added another canned light in the shower area.
This is the picture of the knee wall built where our toilet area will be.
The shower area includes a cutout for holding shampoo.
Primer complete and progress being made.
No comments:
Post a Comment